Piako 110kV Tee Line GXP Project

Dont display in Great Results Category: no

Client Name: Transpower

Strategy & Planning: no

Project Delivery: no

Design: no

Technical Services: no

Consents: no

In response to a request from their customer PowerCo, Transpower initiated the construction of 2km of 110kV line and a two bay substation to provide an additional point of supply in the Morrinsville area. The lines portion of the project required the erection of 22 concrete pole structures on...

New 66kV Transmission Line for Whitianga

Dont display in Great Results Category: no

Client Name: PowerCo

Strategy & Planning: no

Project Delivery: no

Design: no

Technical Services: no

Consents: no

PowerCo require a new transmission line between Coroglen and Kaimarama in the Coromandel. The project required the establishment of line routes, detailed design and consenting of a new 110kV transmission line. The line will be operated at 66kV...

Kopu Coroglen Transmission Line Upgrade

Client Name: PowerCo

Dont display in Great Results Category: no

Strategy & Planning: no

Project Delivery: no

Design: no

Technical Services: no

Consents: no

The 66kV line between Kopu and Coroglen is the original 50kV line built in the 1950’s by New Zealand Electricity Department. The line was constructed of light conductor, and travels through some rugged terrain to bring electricity supply to the upper Coromandel Peninsula. Due to substantial...