Distribution
DOWNLOADGenerator Expertise Slashes SAIDI Impact
Client Name: Powerco
Strategy & Planning: no
Project Delivery: yes
Design: no
Technical Services: yes
Project Overview:
Powerco recently commissioned their new 110kV capable transmission line between Coroglen and Kaimarama. The line construction and subsequent commissioning was the culmination of several years of effort on a very complex project in the Coromandel Peninsula.
Edison Delivery:
Edison undertook the detailed design working closely with Powerco engineers, Tenix, Aggreko and Thames Coromandel District Council to determine the optimal physical layout and electrical points of connection. This included the design of temporary cable arrangements to enable the connection of generation equipment to existing 11kV transformer cables.
Client Feedback:
“A tremendous effort by all and a special thanks to the Edison team who were integral to the success of the project and the SAIDI savings”
Andrew McLeod, Powerco